Jobs Fire Alarm Systems Installer And Servicer near Longueuil (QC)

Available jobs

We found 24 fire alarm systems installer and servicer jobs near Longueuil (QC) on Job Bank. The job postings found are for all Electronic service technicians (household and business equipment) (NOC 22311).

Location Available jobs Links
Longueuil (QC) 24 View job postings >
Québec 56 View job postings >
Canada 194 View job postings >
Job postings throughout the region
Date posted Job title Employer Location Source
Dec. 10, 2024 fire alarm technician PREVENTION INCENDIE SAFETY FIRST INC Saint-Hubert (QC) Québec emploi
Dec. 16, 2024 computer service technician Fed IT Montréal (QC) Jobillico
Dec. 16, 2024 computer service technician Fed IT Montréal (QC) Jobillico
Dec. 16, 2024 alarm system technician Fed IT Montréal (QC) Jobillico
Dec. 4, 2024 fire alarm systems installer and servicer PREVENTION INCENDIE SAFETY FIRST INC Saint-Hubert (QC) Québec emploi
Dec. 16, 2024 videoconference technician Groupe Grandio Boucherville (QC) indeed.com
Dec. 20, 2024 alarm system technician 9161-1020 QUEBEC INC. Blainville (QC) Québec emploi
Dec. 9, 2024 security alarms technician Dièse Intercom inc. Montréal (QC) Jobillico
Dec. 22, 2024 computer equipment installer Xpression Num.Eric Terrebonne (QC) Jobillico
Dec. 9, 2024 computer service technician Micrologic Longueuil (QC) Jobillico

News

Read the latest news stories about job creation and layoffs related to the occupation ofdesign engineer - mechanical (NOC 21301).

The federal government is providing $25M to the Northwest Territories government for the Taltson hydro expansion project. The project involves connecting the North and South Slave systems and building a new facility south of Great Slave Lake. The NWT government aims to support future critical mineral mining in the territory and mitigate energy prices with the hydro expansion.

  • Job creation
  • Utilities
  • Added on 2024-11-13
  • Northwest Territories, NT

The federal government is providing $343,710 to big River Services Centre LP to conduct a renewable energy study on the Mackenzie River in the NWT. Big River aims to investigate the use of an in-stream turbine to generate energy. Canadian Hydrokinetic Turbine Testing Centre will lead the study, slated to start in July.

  • Job creation
  • Professional, scientific and technical services
  • Added on 2024-05-27
  • Northwest Territories, NT

The federal government is providing $150K for public transit feasibility studies for the Nahanni Butte First Nation, Yellowknives Dene First Nation, and Hay River Métis Government. Studies include transit assessments, groundwork for future projects, more efficient connections to Yellowknife, public consultations, and research for community needs.

  • Job creation
  • Professional, scientific and technical services
  • Added on 2024-03-05
  • Northwest Territories, NT

The Inuvialuit are working towards building a gas plant in NWT to produce compressed natural gas, propane, and synthetic diesel. This spring, a bridge will be built over a creek to reach the site. Tuktoyaktuk will be the first Inuvialuit community to switch away from diesel-dependency.

  • Job creation
  • Utilities
  • Added on 2023-11-10
  • Northwest Territories, NT
Labour Market Information Survey
Date modified: